
T47
T47
T47

T47
T47
T47
T47
T47
T47
T47
T47

T47
Smart Calibration to Reach 3cm Accuracy
· Step 1: Machine Dimension Measurement
Utilize the App installed on the Total Station (TS) to measure and
capture precise machine dimension parameters.
· Step 2: Initial Calibration Wizard
Import the measured data into the system and follow the guided
wizard to perform initial sensor calibration.
·Step 3: Intelligent Fine-Tuning
Execute smart fine-tuning after initial setup to optimize accuracy,achieving reliable 3cm-level precision.
T47
·Non-invasive magnetic mounting.
· Guided calibration workflow.
·Ready for operation within 1 day.
Less downtime means saving money for customers and staying onschedule. The kit uses magnetic snap-on sensors,paired with a guidedcalibration app for rapid setup and calibration, ready for operation inone day. Factory setup orinventory setup are also available for new machines.


T47
WORKFLOW TRANSFORMED: BEFORE VS AFTER
·Preparation
·Before: Tedious manual site staking.
·After: One-click 3D model upload with auto-generated guidance.
·Construction
·Before: Endless loop of trial excavation, manual surveying and rework.
·After: Single-operator digging with real-time screen guidance and first-time accuracy.
·Handover
·Before: Slow, physical manual measurements.
·After: Fast digital acceptance using excavation trajectory heatmaps.
T47
Seamlessly integrate our system into your existing fleet-regardless of the machinery brand, boom design, or task-specific attachment.
· Multi-Brand Integration: Fully compatible with leading global OEMs
including SANY, CAT, Komatsu, Volvo, Hitachi, and XCMG.
· Versatile Machine Support: Designed for all major excavator
configurations-Mono Boom, Dual Boom,Tiltrotator, Tilt, Rotor, and
Swing Boom.


T47
·Highway Construction:
Master large-scale earthmoving and roadbed operations.
·MunicipalWorks:
· House Foundation:
High-precision performance tailored for urban infrastructure.
Efficient excavation for residential & commercial foundations.
·Long-Distance Pipe Trench:
Reliable trenching for utility and pipeline networks.
·Dredging:
Specialized capability for waterway maintenance and marine tasks.
·Mine:
Heavy-duty endurance for rigorous mining and quarry extraction.
T47
· Sealed steel enclosure, engineered for long-duration operation and
·Built for demanding job sites, the hardware is designed to withstand vibration, dust, mud, rain, and longworking hours.
Even in challenging environments such as underwater dredging and trenching projects, the system maintains stable and reliable performance.


1.png)